
In 2008 we (the McLean Game Refuge) hired L.R. Enterprises, Inc. to construct a control structure/fishway in Bissell Brook. These structures gave Refuge Staff the ability to simultaneously control water moving into Trout Pond while still allowing fish species to move up and down the brook unhindered. In 2009 we began the second phase of our project, which entailed the complete replacement of a rather large 50-year-old concrete spillway in Trout Pond. Both projects, although challenging in several regards, were completed on time and on budget by LRE. I cannot over state the skill, experience and plain old common sense that LRE brought to our projects. It was a true pleasure to work with Bob and Lee. I highly recommend them to anyone contemplating new construction or repair work in or around water. Steven A. Paine, Director McLean Game Refuge |